HBK took on the task rectifying these defective cavity flashings in Collaroy, In doing so we could assure our clients that this would remediate the water ingress issues that the building was facing.
HBK Took this 90s model bathroom and brought it back to life to fit with current times and trends. With this bathroom been situated on the second level of the property we decided to go with a membrane them to coat liquid waterproofing to ensure it would stand the test of time.